Baltec Marine installs hybrid scrubbers on TT-Line ropax
BALTEC MARINE INSTALLS HYBRID SCRUBBER ON TT-LINE ROPAX
TT-Line is retrofitting four hybrid exhaust gas cleaning systems on its Peter Pan ropax ferry.
The scrubbers are manufactured by Italian firm, Ecospray Technologies and are being installed by Baltec Marine. The estimated delivery time is January 10, 2017.
The scope of work includes: project management, 3D scanning and engineering electrical work including integration with the existing system, installation of the scrubber towers and other Ecospray equipment, installation of GRE piping, fabrication and installation of sea chest, fabrication of holding tanks and fabrication of steel structure for the pump room.
Baltec Marine also completed a second turnkey installation of four hybrid scrubbers on Peter Pan’s sister vessel Nils Holgersson in Landskrona, Sweden between December 2015 and January 2016.
Peter Pan and Nils Holgersson operate between Trelleborg, Sweden and Travemünde, Germany. The vessels were built in 2001 with a capacity of 744 passengers. Peter Pan’s dock capacity is 2,600 lane meters, which allows 169 trailers.
Baltec Marine has installed over 100 scrubbers onboard vessels. The firm offers full turnkey installation packages, and is currently involved in three separate scrubber installation projects onboard three different vessels